Municipality Dobberkau
New construction of a municipal wastewater treatment plant for 50 PE
Profile:
| System: klärocom | Location, building owner: WVSO Wasserverband Standal – Osterburg D-39576 Wittenmoor/Stendal |
|
Designer / consultant:: |
Installation company: utp service GmbH Weidenberger Str. 2-4 D-95517 Seybothenreuth |
Filtration level:
|
|
Air blower type: Becker side-channel blower
Structural engineering: Monolithic cylindrical tank
Commissioning date: May 2022
Dimensioning:
PE
Scope of services of utp umwelttechnik GmbH
Ready-to-use overall performance consisting of:
- detailed engineering and construction site management
- civil works and installation
- asphalt works
- fence building works
- manufacturing, delivery and assembly of the tanks technology as well as of technical equipment
- control unit / automation technology
- EMSR-technology and telecontrol engineering
Specifics
- high groundwater level
- on-site control devices via touch panel
- Effluent pump station for clarified water
- remote monitoring by telemetry modul
- Total construction time: 1.5 weeks