Municipal Deutelbach

Municipal wastewater treatment plant 60 PE

 

Profile:

System: klärocom Location, building owner
Gemeinde Aura im Sinngrund
Schulstraße 3
D-97773 Aura i. Sinngrund
Designer, consultant
Auktor Ingenieur GmbH
Berliner Platz 9
D-97080 Würzburg
Installation company:
utp service GmbH
Weidenberger Str. 2-4
D- 95517 Seybothenreuth

Filtration level:

  • COD –> 90mg/l
  • BOD5 –> 20mg/l
  • Nges –>25mg/l

 

Air blower type: Becker side-channel blower

Structural engineering: Monolithic cylindrical tank

Date of commissioning: August 2019

Dimensioning

Summary:

With temperatures as high as 43° C, the municipal wastewater treatment plant Deutelbach was constructed. utp acted as general contractor.
Three monolith cubicles made from reinforced concrete were moved and a flower patch decorates the area.