Municipality – Groß Garz

Installation of a municipal wastewater treatment plant with five pumping stations

 

Profile:

System: klärocom Location, building owner:
WVSO Wasserverband
Stendal – Osterburg
D-39606 Hansestadt Osterburg (Altmarkt)
Designer, consultant:
utp umwelttechnik GmbH
Weidenberger Str. 2-4
D- 95517 Seybothenreuth
Installation company:
utp service GmbH
Weidenberger Str. 2-4
D- 95517 Seybothenreuth

Filtration level:

  • COD –> 150mg/l
  • BOD5 –> 40mg/l

Air blower type: Becker side-channel blower

Structural engineering: Monolithic cylindrical tank

Date of commissioning: March 2020

Dimensioning

Pumping stations

Existing situation

The small town Groß Garz is a district of the municipality Zehrental located in the county of Stendal.

Customer and later operator of the small wastewater treatment plant is the Water Association Stendal-Osterburg for which the utp-group already installed several small wastewater treatment plants and pumping stations.

In December 2020, the order for the planned wastewater treatment plants was placed with utp umwelttechnik GmbH.

Specifics

  • high groundwater level
  • intake pumping station as shaft-in-shaft system
  • on-site control devices via touch panel
  • remote monitoring by telemetry modul
  • total construction time of 1 week

Scope of services of utp umwelttechnik GmbH

Ready-to-use overall performance consisting of:

  • detailed engineering and construction site management
  • civil works and installation
  • asphalt works
  • fence building works
  • manufacturing, delivery and assembly of the tanks technology as well as of technical equipment
  • control unit / automation technology
  • EMSR-technology and telecontrol engineering